Pre-production — anticipating the constraints before committing to production
We turn a validated prototype into an operational production plan: geometry, throughput, logistics and costs anticipated — to launch the production run with no nasty surprises.

Geometry, logistics, suppliers, lead times, costs, intellectual property: a structured plan before the first batch. The earlier we identify the friction points, the less they cost to fix.
What pre-production covers
Geometry & process
Tolerances, orientation, part optimisation for repeatable production.
Production strategy
Volume, throughput, technology: the right process for the right pace.
Logistics & lead times
Supply, stock and restocking lead times compatible with your schedule.
Supplier mapping
Identification and assessment of supplier-related risks, here and abroad.
Cost projections
Unit cost at scale, break-even thresholds and quantified decision points.
Intellectual property
The risks tied to sharing files before a patent filing, identified and flagged.
We de-risk geometry, throughput, logistics and costs before committing to the first batch
How it unfolds
- 1
Framing the assumptions
We set out the context, the target volume and the constraints.
- 2
Technical & operational audit
We analyse the part and the production chain.
- 3
Structured written deliverable
A clear document: risks, choices, plan and costs.
- 4
Presentation
We present the report and answer your questions.
- 5
Adjustments & decision
We adjust, you decide with full knowledge of the facts.
From Asian subcontracting to a local production run — de-risked in 5 days
A biotech startup had validated a medical device in SLA resin and was considering handing over the production run to an Asian supplier to cut costs. The audit brought to light three problems it had not anticipated: the part's geometry generated a high scrap rate at scale, the restocking lead time was incompatible with its clinical trial schedule, and sending the files exposed its concept before the patent filing. We delivered an alternative roadmap in 5 days. Decision: local production in 3D printing for the first 18 months, revision of the geometry, and a decision point at 500 units.
Frequently asked questions
At what stage should I use this service?
Is the service billed separately?
What data do we need?
Delivery time for the deliverable?
Does the analysis presuppose a particular manufacturing process?
Do you cover intellectual property aspects?
Ready to move to a production run?
Tell us about your prototype — we structure your pre-production. Reply within 24 h.

